Aerial survey project no. 74F-24 was flown on October 25, 1974. These photos are a verbal scale of 1"=250'. The flight line follows an east-west direction and provides coverage for highway 14 and the proposed holding pond 1.5 miles east of the junction with highway 22.
Printing is not supported at the primary Gallery Thumbnail page. Please first navigate to a specific Image before printing.